TM 5-4210-249-13&P-2
0259-1
DRAFT
0259
FIELD LEVEL MAINTENANCE
THERMAL RELIEF VALVE REPLACEMENT
INITIAL SETUP:
REMOVAL
NOTE
Tag and mark wires and vent line prior to removal to ensure proper installation.
1.
Disconnect connector (1).
2.
Remove vent line (2) from elbow (3).
3.
Remove thermal relief valve (4) from pipe (5).
4.
Remove elbow (6) from thermal relief valve (4).
5.
Remove elbow (3) from thermal relief valve (4).
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
TFFT00154
Tools and Special Tools
Tool Kit, General Mechanic’s: Automotive
(WP 0622, Item 27)
Materials/Parts
Compound, Sealing, Pipe Thread
(WP 0625, Item 21)
Tags, Identification (WP 0625, Item 51)
Reference
WP 0489
WP 0615, Fig. 38
Equipment Conditions
Pump house panel A opened (WP 0539)
Water system drained (WP 0041)
Batteries disconnected (TM 9-2320-325-14&P)
Air system drained (TM 9-2320-347-10)