TM 5-4210-249-13&P-2
0281-2
DRAFT
0281
INSTALLATION
NOTE
•
Both foam probes are installed the same way.
•
Ensure vent tube, vent tube hole in gasket, and vent tube hole in tank are aligned.
1.
Calibrate foam level probe (8) (WP 0191).
2.
Install gasket (9) and foam level probe (8) on tank (10) with four screws (7).
NOTE
Install cable ties as required.
3.
Connect connector (6) and install heat shrink (5).
NOTE
Perform Step (3) to install foam level probe cover.
4.
Install cover (3) on hose bed (4) with four screws (1) and washers (2).
END OF TASK
FOLLOW-ON MAINTENANCE
Connect batteries (TM 9-2320-325-14&P)
END OF TASK
END OF WORK PACKAGE
TFFT01082