TM 5-4210-249-13&P-3
0496-3/(4 blank)
DRAFT
0496
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
7.
Install two couplings (3) and (2) on vehicle (WP 0483).
8.
Connect connector (1).
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Install right splash guard (TM 9-2320-325-14&P)
2.
Install pump house panel G (WP 0540)
3.
Install flow sensor (WP 0390)
END OF TASK
END OF WORK PACKAGE
TFFT0763