TM 5-4210-249-13&P-3
0558-1
DRAFT
0558
FIELD LEVEL MAINTENANCE
TRANSMISSION REPLACEMENT
INITIAL SETUP:
REMOVAL
1.
Remove crew cab heater hoses from engine (WP 0209).
Perform Steps (1), (2), (8), and (9).
2.
Remove personnel cab air conditioner hose and connector (TB 9-2320-279-13).
3.
Remove piping from pump house, roof and bumper turret systems; items 3, 4, and 5, and side discharge
system; items 3 and 4 (WP 0490).
4.
Remove engine (TM 9-2320-325-14&P).
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Tools and Special Tools
Drain Pan (WP 0622, Item 9)
Tool Kit, General Mechanic’s: Automotive
(WP 0622, Item 27)
Materials/Parts
Compound, Sealing, Thread
Locking (WP 0625, Item 20)
Oil, Lubricating (WP 0625, Item 37)
Seal, Sentry, Blue (WP 0625, Item 44)
Tags, Identification (WP 0625, Item 51)
Ties, Cable, Plastic (WP 0625, Item 58)
Lockwasher (1)
Lockwasher (1)
Preformed Packing (1)
Preformed Packing (1)
Locknut (3)
Lockwasher (6)
Preformed Packing (1)
Preformed Packing (1)
Preformed Packing (1)
Preformed Packing (1)
Personnel Required
MOS 63B Wheeled vehicle mechanic (2)
References
TM 9-2320-325-14&P
TB 9-2320-279-13
WP 0209
WP 0490
WP 0559
Equipment Conditions
Tire carrier warning light removed (WP 0351)
Tire carrier removed (TM 9-2320-325-14&P)
Hydraulic reservoir removed
(TM 9-2320-325-14&P)
Air system drained (TM 9-2320-347-10)
Hydraulic generator oil drained (WP 0588)