TM 5-4210-249-13&P-3
0297-2
DRAFT
0297
INSTALLATION
1.
Install gasket (4) and water level probe (3) on tank (5) with four screws (2).
NOTE
Install cable ties as needed.
2.
Connect connector (1).
END OF TASK
FOLLOW-ON MAINTENANCE
Connect batteries (TM 9-2320-325-14&P)
END OF TASK
END OF WORK PACKAGE
TFFT01081