TM 5-4210-249-13&P-3
0298-10
DRAFT
0298
FOLLOW-ON MAINTENANCE
1.
Install foam tank fill port extensions and covers (WP 0293)
2.
Install water tank vent/fill valve (WP 0304)
3.
Install water temperature sender (WP 0302)
4.
Install hose bed grating (WP 0526)
5.
Install cross divider (WP 0517)
6.
Install pre-connect (WP 0577)
7.
Install water tank heaters (WP 0300)
8.
Install crew cab assembly (WP 0500)
9.
Install water tank side fill valve (WP 0303)
10. Install foam level probes (WP 0281)
11. Install water level probe (WP 0297)
12. Install tank-to-pump check valve (passenger side) (WP 0296)
13. Install tank-to-pump check valve (driver side) (WP 0295)
14. Install water tank drain valve (WP 0279)
END OF TASK
END OF WORK PACKAGE