TM 5-4210-249-13&P-3
0427-7/(8 blank)
DRAFT
0427
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
10. Install muffler (5) and elbow (4) on control valve manifold (6).
11. Install air line (3) on elbow (4).
12. Connect eight connectors control valve manifold connectors (1) to valve control manifold wire harness
connectors (2).
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Install pump house panel S (WP 0540)
2.
Install pump house panel A (WP 0539)
END OF TASK
END OF WORK PACKAGE
TFFT02355A