TM 5-4210-249-13&P-3
0439-1
DRAFT
0439
FIELD LEVEL MAINTENANCE
CAB FOAM A AND FOAM B TANK LEVEL INDICATOR WIRE HARNESS REPLACEMENT
INITIAL SETUP:
REMOVAL
NOTE
•
Both cab foam wiring harnesses are replaced the same way.
•
Note routing of cab foam tank level indicator wire harness prior to removal to ensure
proper installation.
•
Note position and remove cable ties, split looms, and cushion clips as required.
•
Tag and mark connectors prior to removal to ensure proper installation.
1.
Disconnect cab foam tank level indicator wire harness connector (1) from cab foam tank level indicator gauge
connector (2).
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
TFFT03149
Tools and Special Tools
Tool Kit, General Mechanic’s: Automotive
(WP 0622, Item 27)
Materials/Parts
Tags, Identification (WP 0625, Item 51)
Ties, Cable, Plastic (WP 0625, Item 58)
References
WP 0615, Fig. 55
Equipment Conditions
Cab instrument panel B opened (WP 0311)
Pump operator’s panel housing
opened (WP 0325)