TM 5-4210-249-13&P-3
0488-4
DRAFT
0488
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
13. Connect connector (1).
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Install pressure transducer (WP 0411)
2.
Install flow sensor (WP 0390)
3.
Install pump house panels G and L (WP 0540)
END OF TASK
END OF WORK PACKAGE
TFFT00894