TM 5-5420-202-20-1
Item
No.
22
Preventive
Interval
Semiannual
Maintenance Checks and Services for M60A1 AVLB Hull-
Location
Item to
Check/Service
Mechanical Track
Adjusting Links
(Left and Right
Sides)
Continued
Procedure
Not Fully Mission
Capable if:
Check track adjusting link assem-
blies for broken or missing cotter
pin, lubrication fitting and pin
assemblies.
Check adjusting link assembly barrel,
shaft, eye and yoke for cracks.
NOTE
Pin at roadwheel arm maybe installed with head of pin facing toward
hull.
Lubricate until clean lubricant ap-
pears between barrel and shaft.
Lubricant Mil. Symbol
Temperature Range
(NATO Code)
Specification
Mechanical Track
Adjusting Link
All Temperatures
(G-395)
MIL-G-81322
Capacity
Interval
Man-hour
AR
S
0.1
For arctic operation, see FM 9-207
3-32
Change 4