TM-5-5420-228-24

LAUNCHER HYDRAULICS SYSTEM M48A5/M60A1 TANK CHASSIS, TRANSPORTING: FOR BRIDGE, ARMORED-VEHICLE-LAUNCHED; SCISSORING TYPE, CLASS 60

TECHNICAL MANUAL; ORGANIZATIONAL, DIRECT SUPPORT AND GENERAL SUPPORT; MAINTENANCE MANUAL

AUGUST 1985

  TM-5-5420-228-24 - Page 112 of 750

Change 3
2-68.3
First Technician (Operator's Station)
x
Ensure ball valve is in “TRAVEL” position.
x
Stop engine.
Both Technicians (Outside Vehicle)
x
Have bridge removed from launcher TM 5-
5420-203-14
Second Technician (Operator's Station)
x
Start engine.
x
Move ball valve to “LAUNCH” position.
x
Set engine speed at 1800 rpm.
x
Raise tongue cylinder control lever until tongue
cylinder is fully extended.
x
Move ball valve to “TRAVEL” position.
x
Stop engine.
x
Depress overhead cylinder control lever and
allow tongue to lower slowly to ground.
Both Technicians (Overhead Cylinder)
x
Remove overhead cylinder armor (page 3-
223).
First Technician (Overhead Cylinder)
x
If STE/ICE is available, proceed to test No. 51
(page 2-58.1) to test overhead dual
counterbalance valve T2 quick disconnect.
x
If STE/ICE is not available, connect adapter
hose to gage and adapter to overhead dual
counterbalance valve T2 quick disconnect
fitting.
Second Technician (Operator's Station)
x
Start engine.
x
Move ball valve to “LAUNCH” position.
x
Set engine speed at 1800 rpm.
x
Raise overhead cylinder control lever for five
minutes.
First Technician (Overhead Cylinder)
x
Check if pressure gage or STE/ICE is between
3550 to 3650 psi.
Check overhead dual counterbalance valve for
pressure setting between 3550 to 3650 psi.
Is pressure between 3550 to 3650 psi.
5
YES
NO
TM 5-5420-228-24
DETAILED TROUBLESHOOTING PROCEDURE
LAUNCHER OPERATION – HYDRAULICS
(Continued)
Symptom-1.1
x
Go to step 10.
6


Back to Top