TM-5-5420-228-24

LAUNCHER HYDRAULICS SYSTEM M48A5/M60A1 TANK CHASSIS, TRANSPORTING: FOR BRIDGE, ARMORED-VEHICLE-LAUNCHED; SCISSORING TYPE, CLASS 60

TECHNICAL MANUAL; ORGANIZATIONAL, DIRECT SUPPORT AND GENERAL SUPPORT; MAINTENANCE MANUAL

AUGUST 1985

  TM-5-5420-228-24 - Page 114 of 750

Second Technician (Operator's Station)
Move ball valve to “TRAVEL” position.
Shut engine off.
Cycle bridge launching control levers.
First Technician (Overhead Cylinder)
Remove pressure gage or STE/ICE from
counterbalance valve T2 and install gage plug.
Second Technician (Operator's Station)
Start engine.
Move ball valve to “LAUNCH” position.
Set engine speed at 1800 rpm.
Raise overhead cylinder control lever
momentarily.
First Technician (Top Deck)
Visually check that holddown cylinder does
release.
Check that hold down cylinder does release.
10
FROM STEP 6
System is operational.
Install overhead cylinder armor
(page 3-224).
Perform launch and retrieve
procedures (TM-10).
YES
NO
Change 3
2-68.5
11
TM 5-5420-228-24
DETAILED TROUBLESHOOTING PROCEDURE
LAUNCHER OPERATION – HYDRAULICS
(Continued)
Symptom-1.1
Does holddown cylinder release?


Back to Top