TM-5-5420-228-24

LAUNCHER HYDRAULICS SYSTEM M48A5/M60A1 TANK CHASSIS, TRANSPORTING: FOR BRIDGE, ARMORED-VEHICLE-LAUNCHED; SCISSORING TYPE, CLASS 60

TECHNICAL MANUAL; ORGANIZATIONAL, DIRECT SUPPORT AND GENERAL SUPPORT; MAINTENANCE MANUAL

AUGUST 1985

  TM-5-5420-228-24 - Page 133 of 750

2-80.2
Change 3
TM 5-5420-228-24
DETAILED TROUBLESHOOTING PROCEDURE
LAUNCHER OPERATION – HYDRAULICS
(Continued)
Symptom-3.1
This procedure is to be performed by
two persons. The lead person is referred
to as the first technician and shall direct
the activity of the second person called
the second technician.
NOTE
First Technician (Operator's Station)
Return bridge to bridge seat (TM-10).
Shut engine off.
Move ball valve to “TRAVEL” position.
Cycle bridge launching control levers.
Second Technician (Bridge)
Check quick disconnects between bridge and
launcher are connected and secure.
Check bridge quick disconnects for proper
operation.
1
NO
YES
Replace quick disconnects (TM 5-
5420-203-14).
2
HEU BRIDGE DOES NOT SCISSOR OPEN OR DOES NOT OPEN SMOOTHLY.
Do quick disconnects operate properly?


Back to Top