TM-5-5420-228-24

LAUNCHER HYDRAULICS SYSTEM M48A5/M60A1 TANK CHASSIS, TRANSPORTING: FOR BRIDGE, ARMORED-VEHICLE-LAUNCHED; SCISSORING TYPE, CLASS 60

TECHNICAL MANUAL; ORGANIZATIONAL, DIRECT SUPPORT AND GENERAL SUPPORT; MAINTENANCE MANUAL

AUGUST 1985

  TM-5-5420-228-24 - Page 156 of 750

Change 3
2-90.3/(2-90.4 blank)
TM 5-5420-228-24
Symptom-5.1
First Technician (Operator's Station)
Shut engine OFF.
Move ball valve to “TRAVEL” position.
Cycle bridge launching control levers.
Second Technician (Launcher Tongue)
If STE/ICE is available, proceed to test No. 51
(page 2-58.1) to test tongue dual
counterbalance valve T2 quick disconnect
fitting.
If STE/ICE is not available, connect adapter
hose to gage and adapter to tongue dual
counterbalance valve T2 quick disconnect
fitting.
First Technician (Operator's Station)
Start engine.
Move ball valve to “LAUNCH” position.
Set engine speed at 1800 rpm.
Raise tongue cylinder control lever.
Second Technician ((Launcher Tongue)
Check if pressure gage or STE/ICE is between
3550 to 3650 psi.
Check tongue dual counterbalance valve for
pressure setting of between 3550 to 3650 psi.
Is pressure between 3550 to 3650 psi?
5
Replace cartridge (C2) in
tongue dual counterbalance
valve (page 3-204.64).
If still cannot be brought
within tolerance, notify
support maintenance of
defective valve bank.
Remove pressure gage
assembly from T2.
Replace tongue cylinder.
6
7
NO
YES
DETAILED TROUBLESHOOTING PROCEDURE
LAUNCHER OPERATION – HYDRAULICS
(Continued)


Back to Top