TM
5-5420-228-24
(
(
DETAILED
TROUBLESHOOTING
PROCEDURE
LAUNCHER
OPERATION
- HYDRAULICS
Symptom-6
(Continued)
BRIDGE
DOES
NOT
SCISSOR
CLOSED
OR
DOES
NOT
CLOSE
[
L,.,,
This procedure
is to be performed
by
two
persons.
The
lead
person
is
referred
to as the first technician
and
shall direct
the activity
of the second
person
called
the second
technician.
I
)
Check
bridge
quick disconnects
for proper
operation.
•Return brigde tolaunched position (TM 5-5420-
202-10).
Do quick
disconnects
operate
properly?
)
Replace
quick disconnects
(TM 5-
5420-203-14).
0
NO
A
2-91