TM-9-2320-209-10-2

2 1/2-TON, 6X6, M44A1 AND M44A2 SERIES TRUCKS (MULTIFUEL)

TECHNICAL MANUAL; SCHEDULED MAINTENANCE; OPERATOR LEVEL

SEPTEMBER 1980

  TM-9-2320-209-10-2 - Page 57 of 69

TM9-2320-209-10-2/TO 36A12-1B-1091-2
Table 4-1. Operator/Crew Preventive Maintenance Checks and Services
for Special Purpose Kits - Cent
NOTE: These checks are to be made in the order listed, within designated interval.
B-Before operation
A-After operation M-Monthly
D-During operation
W-Weekly
Interval
Item
Item to be Inspected
Equipment is
No.
Procedure: Check for and have repaired, filled,
not ready/
B D
A
w
M
or
adjusted as needed
available if:
3
A-FRAME KIT
a.
Before operating A-frame (1) , make
sure it is positioned at about a 60° angle and
is securely attached to the front bumper ancl
the inverted pintle hook (2) . Also check
that:
Cable clamps (3) are not loose
Cable is frayed
Cable assembly (4) is not frayed
or broken.
or broken
TA 045372
WARNING
Use leather gloves when checking
winch cable. Injury to hands may
result if gloves are not worn.
b. Inspect A-frame ( 1)
for bends and winch
cable (5) for kinks, frays, and breaks.
Chanae 1
4-7 /(4-8
hlankl


Back to Top