TM-9-2320-209-10-2

2 1/2-TON, 6X6, M44A1 AND M44A2 SERIES TRUCKS (MULTIFUEL)

TECHNICAL MANUAL; SCHEDULED MAINTENANCE; OPERATOR LEVEL

SEPTEMBER 1980

  TM-9-2320-209-10-2 - Page 51 of 69

TM9-2320-209-10-2/T036A12-lB-1091 -2
CHAPTER 2
CHECKOUT,
AllNEMENT,
AND ADJUSTMENT
2-1.
There are no scheduled checkout, alinement, or adjustment procedures, to be
done at the operator’s level of maintenance.
CHAPTER 3
LUBRICATION
3-1.
GENERAL. Refer to LO 9-2320-209-12/1 for lubrication of the vehicle.
3-2.
SPECIAL lNSTRIJCTIONS. Special Instruction
for lubrication of the vehicle by the operator
are found in
LO 9-2320-209-12/1, in instructions for service on receipt of equipment (VOl 1, para 3-1),
and in instructions for operation of vehicle under unusual conditions
(Vol 1,
pm 4-22 and 4-25e).
I
CHAPTER 4
SCHEDULED MAINTENANCE OF MATERIAL
USED IN CONJUNCTION WITH MAJOR ITEMS
4-1 .
GENERAL.
These preventive maintenance checks and services ( PMC S ) cover
the special purpose kits supplies as part of the vehicle. The special purpose kits
include the arctic winterization kit, deep water fording kit, and A-frame kit. Table
4-1 gives PMSC procedures and location of kit components.
4-2. PMCS PROCEDURES .
the interval columns in the
Refer to chapter 1, para 1-1 for the purpose and use of
PMCS table.
2--1/ 3-1/4-1


Back to Top