TM-9-2320-209-10-2

2 1/2-TON, 6X6, M44A1 AND M44A2 SERIES TRUCKS (MULTIFUEL)

TECHNICAL MANUAL; SCHEDULED MAINTENANCE; OPERATOR LEVEL

SEPTEMBER 1980

  TM-9-2320-209-10-2 - Page 46 of 69

TM 9-2320- 209-10-2
Table 1-8.
Operator/Crew Preventive Maintenance Checks and Services
for M756A2 Pipeline Construction Truck - Cent
NOTE :
These checks are to
Item
No.
3
4
B-Before operation
D-During operation
B
)
D
Interval
D
.
A
w
M
be made in the order listed, within designated interval.
A-After operation
W-Weekly
M-Monthly
Item to be Inspected
Procedure: Check for and have repaired, tilled,
or adjusted as needed
REAR WINCH
a. Visually check rear winch drive
chain (1) for damage.
TA 045347
b.
Check that rear winch shear pin (2)
is in place and serviceable (located on back
side of sprocket).
A FRAME
Check that A-Frame parts are not
missing, broken, or damaged.
Equipment is
not ready/
available if:
A-Frame cannot
be
used due to
damaged or
missing parts.
1-30


Back to Top