TM-9-2320-209-10-2

2 1/2-TON, 6X6, M44A1 AND M44A2 SERIES TRUCKS (MULTIFUEL)

TECHNICAL MANUAL; SCHEDULED MAINTENANCE; OPERATOR LEVEL

SEPTEMBER 1980

  TM-9-2320-209-10-2 - Page 37 of 69

TM 9-2320-209-10-2
Table 1-4. Operator /Crew Preventive Maintenance Checks and Services
for M50A1, M50A2, and M50A3 Water Tank Trucks - Cont
NOTE: These checks are to be made in the order listed, within designated interval.
B-Before operation
A-After operation M-Monthly
D-During operation
W-Weekly
Interval
Item
Item to be Inspected
Equipment is
No.
Procedure: Check for and have repaired, filled,
not ready/
B D A
w
M
or adjusted as needed
available if:
2
TANK BODY
a. Check that tank body is not leaking.
b. Check that the body mounting bolts
Two or more
are not broken or missing (locations
mounting bolts
illustrated below). broken or
missing.
Right-side tank body front (1),
center (2), and rear (3) mounting
bolts.
1-21


Back to Top