TM-9-2320-209-10-2

2 1/2-TON, 6X6, M44A1 AND M44A2 SERIES TRUCKS (MULTIFUEL)

TECHNICAL MANUAL; SCHEDULED MAINTENANCE; OPERATOR LEVEL

SEPTEMBER 1980

  TM-9-2320-209-10-2 - Page 32 of 69

TM 9-2320-209-10-2/TO36A12-1B-1091-2
Table 1-3.
Operator/Crew preventive Maintenance Checks and Services
for M49AlC and M49A2C Fuel Tank Trucks
NOTE: These checks are to
1
B-Before operation
D-During operation
be made in the order listed, within designated interval.
A-After operation
W-Weekly
M-Monthly
REAR COMPARTMENT
Open rear doors and check that the
following items are not loose or obviously
damaged.
Delivery pump (1)
Strainer (2)
Fuel lines (3)
Controls (4)
Ground wire reel (5)
NOTE
Controls for both fuel tank trucks
are the same except as shown.
Delivery pump,
strainer, fuel
lines, controls,
or ground wire
reel loose or
unserviceable.
1-16


Back to Top