TM-9-2320-209-20-3-1

2½-TON, 6X6, M44A1 AND M44A2 SERIES TRUCKS (MULTIFUEL)

TECHNICAL MANUAL; TROUBLESHOOTING; ORGANIZATIONAL LEVEL; VOLUME 3 OF 3; PART 1 OF 4

MAY 1981

  TM-9-2320-209-20-3-1 - Page 664 of 830

TM 9-2320-209-20-3-1
c.
Repair.
1.
Take off all loose outer covering (1).
Clean conduit (2) and take off as much of
covering as you can.
2.
Wrap cable with insulating tape from one end to the other. Be sure to have a
lap joint one half the width of the tape.
Tie loose end of tape at the connectors
(3).
3.
Resolder any wires which have been broken or pulled off connector terminal
(4).
4.
Clean corrosion from pin terminal and pin socket connector fittings (5 and 6)
with sandpaper or crocus cloth.
END OF TASK
7-228


Back to Top