TM-9-2320-209-20-3-2

2½-TON, 6X6, M44A1 AND M44A2 SERIES TRUCKS (MULTIFUEL)

TECHNICAL MANUAL; TROUBLESHOOTING; ORGANIZATIONAL LEVEL; VOLUME 3 OF 3; PART 2 OF 4

MAY 1981

  TM-9-2320-209-20-3-2 - Page 453 of 552

TM 9-2320-209-20-3- 2
FRAME 4
1 .
Put two spacers (1) onto spare wheel carrier (2). Line up screw holes .
2 .
Open tool box (3) .
Set tool box down on spacers (1). Line up screw holes .
3 .
Put six screws (4) down through holes in tool box (3) and through spacer s
(1) and spare wheel carrier (2) .
4 .
Using 9/16-inch wrench, hold screws (4). Using 9/16-inch wrench, screw o n
and tighten four nuts (5) .
GO TO FRAME 5
16-32


Back to Top