TM-9-2320-209-20-3-2

2½-TON, 6X6, M44A1 AND M44A2 SERIES TRUCKS (MULTIFUEL)

TECHNICAL MANUAL; TROUBLESHOOTING; ORGANIZATIONAL LEVEL; VOLUME 3 OF 3; PART 2 OF 4

MAY 1981

  TM-9-2320-209-20-3-2 - Page 444 of 552

TM 9-2320-209-20-3- 2
c .
Assembly .
1 .
2 .
3 .
4 .
5 .
Check all parts .
Throw away any damaged parts and put new parts in thei r
place .
Lift up and hold pawl (1) out of the way .
Put shaft (2) through housing (3 )
and bracket (4) .
Let go of pawl .
Put cotter pin (5) through hole in end of shaft (2). Using pliers, bend ope n
ends of cotter pin .
WARNIN G
Always wear leather gloves when handling cable. D o
not let cable run through hands. Broken or rusty wire s
can cause serious injury to personnel .
Put one end of cable (6) through each hole in shaft (2). Hold both ends o f
cable together so they are even when pulled .
Pull them until they are throug h
shaft .
Put both ends of cable (6) down through opening (7) in bottom of housing (3) .
GO TO FRAME 2
16-2 3


Back to Top