TM 9-2320-209-20-3-3
FRAME 3
1.
2.
3.
Put front discharge lever (1) in forward (off) position.
Using pliers, pull cable (2) through hole in bolt (3) until all slack is out of
cable.
CAUTION
Do not put any tension on cable (2)
Using 1/2-inch wrench, tighten nut (4).
when tightening nut (4).
NOTE
Follow-on Maintenance Action Required:
1.
Lubricate tubes. Refer to LO 9-2320-209-12/1.
2.
Refer to discharge valve replacement, para 18-53,
for replacement of bottom cover plate under tank
section of chassis.
END OF TASK
18-288