TM 9-2320-209-34-2-2
FRAME 2
1.
Working under side of van body at front (1), put two screws (2) through
washer (3), inner spring (4), and outer spring (5).
2.
Put two screws (2) through bracket (6) and put on two nuts (7).
3.
Do steps 1 and 2 again on other side of truck.
GO TO FRAME 3
17-468