TM 9-2320-209-34-2-3
FRAME 7
Soldiers
1. Align screw holes in earth boring machine propeller shaft (1) with
A and B
screw holes in power divider companion flange (2).
Soldier A
2.
Put in two screws (3).
3.
Put on two nuts (4).
Soldiers
4.
Align screw holes in earth boring machine propeller shaft (1) with
A and B
screw holes in main drive idler gear companion flange (5).
Soldier B
5. Put in four screws (6).
6.
Put on four nuts (7).
END OF TASK
18-167