2-150
Change 4
TM 9-2320-260-10
b. Operation of Wrecker Crane (M816).
(1) Preparation for Lifting.
.
WA R N I N G
.
Do not use wrecker boom hook tiedown sling for lifting. Sling may snap
during lifting of load and cause serious injury to personnel.
(a)
For night operation, move main floodlight control switch (1) to ON position if tactical
situation permits.
(b)
Move floodlight switch (2) to ON position for each floodlight to be used.
.
WA R N I N G
.
• Do not get underneath the wrecker boom when raised unless properly
secured. Failure to do this may result in injury or death to personnel.
HIGH INTENSITY N O I S E
• Hearing protection is required for all personnel working in and around
this vehicle with the engine running.
2-28. OPERATION OF WRECKER CRANE
.
WA R N I N G
.
Outrigger is heavy. Stand clear of outrigger to avoid injury.
a. Position Wrecker.
Position the wrecker on
firm, level ground whenever possible. Determine
which type of lifting is necessary (i.e., rear lift, lift
and swing, heavy rear lift or a heavy side lift) and
position the wrecker accordingly. For heavy loads,
the wrecker should be positioned for a direct rear
lift with the elast amount of boom extension.
N O T E
Refer to the safe load data plate
located near the crane controls. Select
the lifting method (with or without
outriggers) and crane radius that will
permit crane operation within safe
limits while lifting the load. Position
the wrecker close enough to the load
to operate the crane at the radius you
have selected.
BOOM
PIVOT
POST
HOIST HOOK
RADIUS