TM-9-2320-260-20

TRUCK, 5-TON, 6X6, M809 SERIES (DIESEL)

TECHNICAL MANUAL; UNIT MAINTENANCE

APRIL 1995

  TM-9-2320-260-20 - Page 1137 of 1337

TM 9-2320-260-20
I
14-11. PERSONNEL HOT WATER HEATER HOSE REPLACEMENT
THIS TASK COVERS:
a. Removal
b. Installation
INITIAL SETUP
APPLICABLE MODELS
EQUIPMENT CONDITION
All
Parking brake set (TM 9-2320-260-10).
MATERIALS/PARTS
Hood raised and secured (TM 9-2320-260-10).
Lower right panel (TM 9-2320-260-10).
Antiseize tape (Appendix C, Item 30)
• Cooling system drained (para. 3-45).
REFERENCES (TM)
TM 9-2320-260-10
TM 9-2320-260-20P
NOT E
Close water manifold and engine oil cooler valves prior
to removal.
Have drainage container ready to catch coolant.
1.
Remove two clamps (12) and hose (13) from elbow (14) and engine oil cooler valve (8).
2. Remove two clamps (2) and hose (3) from elbow (1) and water manifold valve (6).
3. Remove water manifold valve (6), elbow (4), and bushing (5) from water manifold (7).
4.
Remove engine oil cooler valve (8), elbow (11), and bushing (9) from engine oil cooler (10).
5. Remove elbows (1) and (14) from personnel hot water heater (15).
1. Apply anti seize tape to male threads of water manifold valve (6), engine oil cooler valve (8), two
bushings (5) and (9), and elbows (4) and (11).
2. Install elbows (1) and (14) on personnel hot water heater (15).
3. Install bushing (9), elbow (11), and engine oil cooler valve (8) on engine oil cooler (10).
4. Install bushing (5), elbow (4), and water manifold valve (6) on water manifold (7).
5. Install hose (3) on elbow (1) and water manifold valve (6) with two clamps (2).
6. Install hose (15) on elbow (14) and engine oil cooler valve (8) with two clamps (12).
14-20


Back to Top