0900
TM 9-2320-260-20
Section II. MAINTENANCE ALLOCATION CHART (Contd)
[1)
(2)
(3)
(4)
(5)
(6)
Maintenance level
hit
s%%
z
-t
Group
Maintenance
Teals and
Number
Cornponont/hwnbly
Function
c
Q
F
H
D
Equipment
Remarks
Flange, output
Inspect
0.3
Replace
1.0
7,8,10
Cushion, Mounting
Inspect
0.2
Replace
1.0
7,8,10
Gear, Speedometer
Inspect
0.2
Replace
0.5
7,8,10
Seals, Input, and Output
Inspect
0.5
shaft
Replace
2.0
1 thru 4
Bearings, Gears, and
Inspect
0.5
shafts
Replace
2.0
7,8,10,
12,13,14
Repair
3.0
7,8,10,
12,13,14
Controls and Linkage,
Inspect
0.1
A
Transfer
A$ust
0.3
1
thru
4
Replace
1.5
1
thru
4
Valve, Breather
Inspect
0.2
Service
0.2
1 thru 4
Replace
0.2
1
thru
4
09
PROPELLER AND
PROPELLER SHAFTS
Propeller Shafks
Inspect
0.1
0.1
A
Service
0.1
1
thru
4
Replace
1.5
1
thru
4
Repair
1.5
1
thru
4
Bearing,
Center
Inspect
0.1
Replace
1.5
1
thru
4
Joint, Universal
Inspect
0.1
0.1
Service
0.3
1
thru
4
A
Replace
1.5
1
thru
4
10
FRONT AxLE
1000
Front
Axle Assembly
Inspect
0.1
A
Service
1.0
1
thru
4
A
Replace
5.0
7,8,10
Repair
1.0
7.0
7,8,10
Overhaul
10.0
K
B-11