B-20
TM 9-2320-260-20
Section II. MAINTENANCE ALLOCATION CHART (Contd)
(1)
(2)
(3)
(4)
(5)
(6)
Maintenance level
Unit
Diluct
‘-r”
Depot
support
sqlporl
Group
Maintenance
Tools and
Number
Component/Assembly
Function
c
~ F H D Equipment Remarks
W]nch, Cable ‘lkmsioner
Inspect
0.1
Service
0.1
Replace
0.5
Repair
1.0
12,13,14
Winch Assembly, Side
Service
0.5
Replace
1.2
7,8,9
Cable, Winch Assembly
Inspect
0.1
Service
0.3
Replace
1.0
1 thru
4
Repair
1.5
1 thru 4
Roller, Rear
Service
0.5
Replace
2.0
1
thru
4
Repair
2.5
7,8
Snatch, Block
Service
0.1
Replace
0.1
Repair
1.5
1 thru 4
Sheave Swivel, Winch
Replace
0.5
1 thru 4
Assembly
Repair
1.5
1
thru
4
Pump, Hydraulic Valve
Inspect
0.2
A
Service
0.1
1
thru
4
Replace
3.2
7,8
Repair
4.0
7,8
Valves, Control
Replace
3.5
7,8
Repair
4.0
7,8
Lines and Fittings,
Inspect
0.2
A
Hydraulic
Repair
0.5
1
thru
4
Pump, Hydraulic Hoist
Replace
1.0
1
thru
4
Repair
2.0
1
thru
4
Control box, Dump
Replace
0.3
1
thru
4
Repair
0.4
1
thru
4
Oil Reservoir, Wrecker
Inspect
0.3
Service
0.1
1 thru
4
A
Replace
1.6
1
thru
4
Control, Throttle Lever
Ac@st
0.3
1
thru 4
Replace
1.0
1
thru
4