TM 9-2320-260-20
Section II. MAINTENANCE ALLOCATION CHART (Contd)
[1)
(2)
(3)
(4)
(5)
(6)
Maintenance level
Unit
S&Sl
=
-t
Group
Maintenance
Tools and
Number
Component/Assembly
Function
c
Q
~
H
D
Equipment
Remarks
lknsioner, Winch
Inspect
0.3
Replace
0.5
1
thru
4
Repair
0.5
1 thru 4
Fluid, Piker Hydraulic
Inspect
0.2
0.1
Wrecker
A
Service
0.2
1 thru 4
Replace
0.3
1 thru 4
Vertical and Horizontal
Inspect
0.2
Rollers, Rear W]nch
Replace
1.0
1 thru
4
Repair
0.5
7,8
Cylinder, Boom Lift
Inspect
0.8
Replace
1.8
1
thru
4
Repair
4.0
7,8
Cylinder, Ram Assembly
Inspect
0.8
.Replace
1.8
1 thru 4
Repair
4.0
7,8
Controls, Van Liftgate
Inspect
0.1
A
Adjust
0.5
1 thru 4
Replace
3.5
1 thru
4
Cylinder, Van Liftgate
Inspect
Replace
3.0
7,8
Repair
2.5
7,8,9,12,
13,14
2004
Power ‘Mceoff, Transmission
Inspect
0.2
Replace
1.0
7,8,10
Repair
4.0
7,8,10
Linkage, Shifl Power
A~ust
0.3
1
thru
4
‘1.hlceoff
Replace
1.0
1 thru
4
Power Divider
Replace
1.2
7,8
Repair
2.5
7,8,10
Power Divider Controls
Ac@st
0.3
1 thru 4
and Linkage
Replace
0.5
1 thru 4
Shaft, Propeller Drive
Service
0.1
1
thru
4
Replace
0.8
1 thru
4
Repair
1.4
1 thru 4
B-21