TM-9-2320-272-10

TRUCK, 5-TON, 6X6, M939, M939A1, AND M939A2 SERIES TRUCKS (DIESEL)

TECHNICAL MANUAL; OPERATOR'S MANUAL

SEPTEMBER 2004
CHANGE 2

  TM-9-2320-272-10 - Page 156 of 481

2-57
Table 2-3. Preventive Maintenance Checks and Services for Models M939/A1/A2 (Contd).
ITEM
NO.
INTERVAL
ITEM TO
CHECK/
SERVICE
NOT FULLY
MISSION
CAPABLE IF:
TM 9-2320-272-10
LOCATION
25
26
After
After
Surge
Tank
Power-
train
Check coolant level in surge tank
(2). Tank should be filled to approxi-
mately bottom end of fill tube (1)
before operation. Fill if necessary.
Check for oil leakage or damage
(para. 2-9).
Any class III
leak.
CREWMEMBER
PROCEDURE


Back to Top