TM-9-2320-272-23-1

TRUCK, 5-TON, 6X6, M939, M939A1, AND M939A2 SERIES TRUCKS (DIESEL)

TECHNICAL MANUAL; FIELD MAINTENANCE MANUAL; VOLUME 1 OF 5

SEPTEMBER 2012

  TM-9-2320-272-23-1 - Page 664 of 1313

FIELD MAINTENANCE
PTO LEAKING LUBRICANT
INITIAL SETUP:
Tools and Special Tools
Tool Kit, General Mechanic's: Automotive
(Volume 5, WP
0826, Table 1, Item 56)
Personnel Required
(2)
References
Point to Point Schematics
Volume 4, WP
0728
Equipment Condition
Vehicle parked and engine shut down.
(TM
9-2320-272-10)
TROUBLESHOOTING PROCEDURE
PTO LEAKING LUBRICANT
NOTE
Conduct these malfunction tests if lubrication is leaking at PTO. This procedure will check
PTO for loose mounting screws.
TM 9-2320-272-23-1
0069
0069-1


Back to Top