FOLLOW-ON MAINTENANCE
1.
Connect battery ground cables. (WP
0350)
2.
Fill coolant. (WP
0287)
3.
Install surge tank cap. (TM 9-2320-272-10)
4.
Start engine and check for leaks at water manifold. Check temperature gauge for proper operation.
(TM
9-2320-272-10)
5.
Install right splash shield. (TM 9-2320-272-10)
END OF TASK
END OF WORK PACKAGE
TM 9-2320-272-23-2
0334
0334-4