FOLLOW-ON MAINTENANCE
1.
Prime fuel system (M939A2). (WP
0239)
2.
Prime fuel system (M939/A1). (TM 9-2320-272-10)
3.
Install left splash shield. (TM 9-2320-272-10)
4.
Start engine and check fuel pump for leaks and operation. (TM 9-2320-272-10)
END OF TASK
END OF WORK PACKAGE
TM 9-2320-272-23-2
0260
0260-5/6 blank