INSTALLATION
NOTE
Wrap all male pipe threads with antiseize tape before installation.
1.
Position two blocks (Figure 2, Item 11), four blocks (Figure 2, Item 9), two blocks (Figure 2, Item 10), and heater
pad (Figure 2, Item 1) in battery box (Figure 2, Item 2).
2.
Install nipple (Figure 2, Item 12) and elbow (Figure 2, Item 7) on heater pad (Figure 2, Item 1) at floor panel
(Figure 2, Item 8).
3.
Install adapter (Figure 2, Item 6) on elbow (Figure 2, Item 7).
4.
Install inlet hose (Figure 2, Item 5) and outlet hose (Figure 2, Item 4) on engine coolant heater pad
(Figure
2,
Item
1) and adapter (Figure 2, Item 6) and tighten two hose clamps (Figure 2, Item 3).
TM 9-2320-272-23-4
0758
0758-4