INSTALLATION
1.
Install two brackets (Figure 2, Item 9) on voltage regulator (Figure 2, Item 8) with four washers
(Figure
2,
Item
4) and screws (Figure 2, Item 3).
NOTE
Assistant will help with Step (2).
2.
Install voltage regulator (Figure 2, Item 8) on floorboard (Figure 2, Item 10) with four washers
(Figure
2,
Item
2), screws (Figure 2, Item 1), washers (Figure 2, Item 2), and nuts (Figure 2, Item 5).
3.
Connect harness connectors (Figure 2, Items 6 and 7) to voltage regulator (Figure 2, Item 8).
4.
Connect battery ground cables (Volume 2, WP
0350).
5.
Start engine (TM 9-2320-272-10).
6.
Check battery generator indicator on instrument panel to ensure it is in green area. If adjustment is necessary,
notify your supervisor.
TM 9-2320-272-23-5
0793
0793-4