TM 9-2320-272-24-1
Table 2-1. Unit Preventive Maintenance Checks and Services (Contd).
48
Annual
Com-
pressed air
system
PROCEDURE
Check for faulty check valves at the primary and secondary
air tanks and crossed hoses. Crossed hoses occur from A
treadle valve air supply hoses at the primary and secondary
air tanks, and B primary and secondary air gauge lines at
the treadle valve.
• Chock vehicle wheels. Failure to do so may result
in injury or death to personnel.
• Wear safety goggles while performing inspection.
Line is under pressure. Failure to do so may result
in injury to personnel from flying parts or debris.
NOT FULLY
MISSION
CAPABLE IF:
2-46