TM-9-2320-273-20

TRUCK TRACTOR, LINE HAUL; LIGHT EQUIPMENT TRANSPORTER; TRUCK CHASSIS; MEDIUM EQUIPMENT TRANSPORTER

TECHNICAL MANUAL; ORGANIZATIONAL MAINTENANCE

NOVEMBER 1980

  TM-9-2320-273-20 - Page 1022 of 1500

TM 9-2320-273-20
-.
.
BRAKE SYSTEM.
9-27. DOUBLE-CHECK VALVE MAINTENANCE.
THIS TASK COVERS: (APPROXIMATE TIME REQUIRED FOLLOWS TASK DESCRIPTION.)
a. Removal.
( 5)
b. Installation.
(10)
c. Checking for Leaks.
(10)
25 Minutes Total.
INITIAL SETUP
EQUIPMENT CONDITION
APPLICABLE CONFIGURATIONS
PARAGRAPH
CONDITION DESCRIPTION
All.
9-13A.
Air Reservoirs Drained.
TEST EQUIPMENT
None.
SPECIAL TOOLS
None.
MATERIALS/PARTS (P/N)
Liquid Teflon (refer to appendix C).
Masking Tape.
Marking Pencil.
Soap and Water Solution.
PERSONNEL REQUIRED
One (MOS-63B20).
REFERENCES (TM)
TM 9-2320-273-10.
TM 9-2320-273-20P.
TROUBLESHOOTING REFERENCES
Table 9-1.
SPECIAL ENVIRONMENTAL CONDITIONS
Vehicle Parked on Level Ground.
GENERAL SAFETY INSTRUCTIONS
Engine OFF.
Transmission in Neutral.
Park Brake Set.
9-102


Back to Top