TM-9-2320-273-20

TRUCK TRACTOR, LINE HAUL; LIGHT EQUIPMENT TRANSPORTER; TRUCK CHASSIS; MEDIUM EQUIPMENT TRANSPORTER

TECHNICAL MANUAL; ORGANIZATIONAL MAINTENANCE

NOVEMBER 1980

  TM-9-2320-273-20 - Page 1026 of 1500

TM 9-2320-273-20
BRAKE SYSTEM.
9-28a DOUBLE-CHECK AND STOPLAMP VALVE MAINTENANCE (M918 AND M919).
THIS TASK COVERS: (APPROXIMATE TIME REQUIRED FOLLOWS TASK DESCRIPTION.)
a.
Removal.
(10)
b.
Installation.
(10)
c.
Operational Check.
(10)
30 Minutes Total.
INITIAL SETUP
EQUIPMENT CONDITION
APPLICABLE CONFIGURATIONS
PARAGRAPH
CONDITION DESCRIPTION
M918 and M919.
9-13A.
Air Reservoirs Drained.
TEST EQUIPMENT
None.
SPECIAL TOOLS
None.
MATERIALS/PARTS (P/N)
Liquid Teflon (refer to appendix C).
PERSONNEL REQUIRED
One (MOS-63B20).
REFERENCES (TM)
TM 9-2320-273-10.
TM 9-2320-273-20P.
TROUBLESHOOTING REFERENCES
SPECIAL ENVIRONMENTAL CONDITIONS
Vehicle Parked on Level Ground.
GENERAL SAFETY INSTRUCTIONS
Engine OFF.
Transmission in Neutral.
Park Brake Set.
Table 9-1.
9-106


Back to Top