TM 9-2320-279-10-2
M984E1 General Operating Procedures (Cont)
2-66. TOW SPADE INSTALLATION/REMOVAL (CONT).
(20)
Remove 8-ft (2.5 m) chain (12) from two towing shackles (4).
(21)
Return crane to stowed position (para 2-64).
(22)
(23)
(24)
Push RIGHT TOW CYLINDER control lever (20) and LEFT TOW
CYLINDER control lever (21) to retract right tow cylinder (22) and left
tow cylinder (23).
Remove two 16-ft (5 m) safety chains (24) from stowage.
Hook one end of safety chain (24) on crosstube hook (25) with one link
showing.
2S120