TM 9-2320-279-10-2
M984E1 General Operating Procedures (Cont)
2-66. TOW SPADE INSTALLATION/REMOVAL (CONT).
(6)
Remove two 16-ft (5 m) safety chains
stowage.
(7)
(8)
(9)
(10)
(11)
(7) and put safety chains in
Remove two quick pins (8) and pins (9) from tow spades (10).
Install 8-ft (2.5 m) chain (11) on two towing shackles (12).
Set up crane for remote operation (para 2-64).
NOTE
Use pry bar to help remove tow spades.
Soldier A holds left and right extension bars (13) while Soldier B
removes tow spades (10) from extension bars.
Install two pins (9) and quick pins (8) in tow spades (10).
2-124