M984E1 General Operating Procedures
TM 9-2320-279-10-2
(Cont)
(8)
Remove two nuts (5), washers (6), screws (7), and brackets (8) from
emergency tow lights (4). Stow emergency tow lights and brackets.
(9)
(10)
Remove and stow two 12-ft (3.5 m) cross chains (9).
Unwrap two springs (10) from crosstube (11) and connect to tow
cylinders (12).
2-407