TM-9-2320-279-10-2

M977 SERIES, 8x8 HEAVY EXPANDED MOBILITY TACTICAL TRUCKS (HEMTT)

OPERATOR’S MANUAL VOLUME 2 OF 2

DECEMBER 1998
CHANGE 3

  TM-9-2320-279-10-2 - Page 73 of 819

TM 9-2320-279-10-2
PMCS Tables (Cont)
Table 2-6. M964E1 Operator/Crew
Preventive Maintenance Checks and Services (Cont)
NOTE:
Within designated interval, these checks are to be performed in the order listed.
B-Before Operation D-During Operation A-After Operation W-Weekly M-Monthly
Item to be Inspected
Procedure: Check for and have repaired, filled,
or adjusted as needed
MATERIAL HANDLING CRANE (CONT)
Equipment is
not ready/
available if:
WARNING
Keep boom clear of all electrical lines and
other obstacles while operating crane.
Serious injury or death could result upon
contact.
CAUTION
Do not hit outrigger leg with hook block.
(e) Move BOOM control lever (17) to UP
position until hook (18) is 5 to 6 feet
(1.5 to 1.8 m) above left rear fender,
and boom (19) is approximately 45°
above horizontal.
2-38.2
Change 3
Boom does
not raise.


Back to Top