TM-9-2320-279-10-2

M977 SERIES, 8x8 HEAVY EXPANDED MOBILITY TACTICAL TRUCKS (HEMTT)

OPERATOR’S MANUAL VOLUME 2 OF 2

DECEMBER 1998
CHANGE 3

  TM-9-2320-279-10-2 - Page 782 of 819

TM 9-2320-279-10-2
Preparation for Transport and Operation (Cont)
E-13. EQUIPMENT BODY REMOVAL/INSTALLATION.
a. Removal.
CAUTION
Proper procedures must be followed closely when
removing the equipment body or damage to vehicle may
occur.
NOTE
Removal of equipment body is a two-soldier task.
During removal of equipment body, store all
hardware removed in stowage compartments.
Rotate fairlead/tensioner as required to gain access to
nuts and screws.
(1)
Lower tensioner to operating position (para 2-65a).
(2)
Remove four nuts (1), screws (2), and plate (3).
(3)
Remove two rollers (4).
CAUTION
When removing shaft and block, keep upright to
prevent loosening or losing order of flatwashers on
shaft. Mixup of flatwashers during assembly will cause
damage to equipment.
(4)
Remove shaft and block (5).
E-3


Back to Top