TM 9-2320-279-10-2
Preparation for Transport and Operation (Cont)
E-13. EQUIPMENT BODY REMOVAL/INSTALLATION (CONT).
(9)
(10)
(11)
Disconnect four heavy-duty winch hydraulic hoses (19) from each
other and pull through hole in equipment body.
Remove dust cap (20) from fitting (21).
Connect four heavy-duty winch hydraulic hoses (19).
(12)
Remove lifting device from four corner lifting eyes (1) and stow. If
onboard crane was used, return to transport position (para 2-64).
E-16