TM-9-2320-279-20-1

M977 SERIES, 8x8 HEAVY EXPANDED MOBILITY TACTICAL TRUCKS (HEMTT)

TECHNICAL MANUAL; MAINTENANCE INSTRUCTIONS; ORGANIZATIONAL MAINTENANCE, VOLUME 1 OF 3

  TM-9-2320-279-20-1 - Page 965 of 985

TM 9-2320-279 -20-1
Electrical System Maintenance Instructions (Cent)
7-105.
CLEARANCE LIGHT WIRING HARNESS REMOVALIINSTALLATION (M977, M985)
(CONT).
(4)
Connect clearance light wiring
harness (1) to clearance light
assembly wire (9) at
connectors (10).
(5) Install cushion clip (11) on
connectors (10). Install cushion
clip with screw (12), two
lockwashers (13), and nut (14).
c. Follow-on Maintenance.
(1)
Connect batteries (para 7-91).
(2) Check operation of clearance
lights (TM 9-2320-279-10).
END OF TASK
TA1 85675


Back to Top