TM-9-2320-279-34-3

M977 SERIES, 8x8 HEAVY EXPANDED MOBILITY TACTICAL TRUCKS (HEMTT)

TECHNICAL MANUAL; MAINTENANCE INSTRUCTIONS DIRECT SUPPORT AND GENERAL SUPPORT, VOLUME 3 OF 3

  TM-9-2320-279-34-3 - Page 254 of 717

TM 9-2320-279-34-3
M977, M985, and M984E1 Crane Maintenance Instructions (Cont)
17-27. EIGHT BANK VALVE BODY MOUNTING BRACKET REMOVAL/INSTALLATION (CONT).
b. Installation.
(1)
Aline and install mounting bracket (1)
on valve body (2).
(2)
Install four screws (3) and lockwashers (4).
(3)
Install four screws (5) and lockwashers (6).
(4)
Connect two hydraulic lines (7).
c. Follow-on Maintenance.
(1)
Install eight bank valve body and mounting
bracket (para 17-26).
(2)
Install accumulator (para 17-30).
(3)
Install crane controls (TM 9-2320-279-20).
END OF TASK
17-122


Back to Top