TM-9-2320-279-34-3

M977 SERIES, 8x8 HEAVY EXPANDED MOBILITY TACTICAL TRUCKS (HEMTT)

TECHNICAL MANUAL; MAINTENANCE INSTRUCTIONS DIRECT SUPPORT AND GENERAL SUPPORT, VOLUME 3 OF 3

  TM-9-2320-279-34-3 - Page 269 of 717

TM 9-2320-279-34-3
M977, M985,
and M984E1 Crane Maintenance Instructions (Cont)
(38)
Install plate (108) and four preformed packings (109) on directional valve (85).
NOTE
All four pilot valves are assembled the same way.
Be sure to aline port holes in pilot valve assembly with port holes in directional
valve.
(39)
Install pilot valve assembly (110) with four screws (111) and caps (112)
(40)
Install relief valve (113), spring (114), and adjustment screw (115) in valve body (5).
(41)
Install preformed packing (116) and plug (117).
d. Follow-on Maintenance.
(1)
Install eight bank valve body (para 17-27).
(2)
Adjust hoist relief valve (para 17-25).
END OF TASK
17-137


Back to Top