TM-9-2320-279-34-3

M977 SERIES, 8x8 HEAVY EXPANDED MOBILITY TACTICAL TRUCKS (HEMTT)

TECHNICAL MANUAL; MAINTENANCE INSTRUCTIONS DIRECT SUPPORT AND GENERAL SUPPORT, VOLUME 3 OF 3

  TM-9-2320-279-34-3 - Page 264 of 717

TM 9-2320-279-34-3
M977, M985, and M984E1 Crane Maintenance Instructions (Cont)
17-28. EIGHT BANK VALVE BODY REPAIR (CONT).
NOTE
Gear may be assembled for right or left
hand use.
(6)
Install preformed packing (21) and
cap (22) with four screws (23).
(7)
Install two preformed packings (24)
and backup rings (25) on gear (26).
Aline gear in cap (22).
(8)
Install preformed packing (27) and
fitting (28).
(9)
Install seal washer (29) and screw (30)
in cap (22).
(10)
(11)
(12)
(13)
Install two preformed packings (31) and three
preformed packings (32).
Install directional valve (17) with four screws (33) in
valve body (5).
Install two preformed packings (34) and fittings (35).
Install preformed packing (36),
fitting (37), tee (38), and cap (39)
in valve body (5).
17-132


Back to Top